Services

A 22 MW hall engineered around your GPU cluster.

Dedicated halls for AI and HPC at scale: direct liquid cooling, closed-loop plant, 2N utility power and the security envelope you specify. The first 22 MW hall goes live in late 2026; the campus is heading for a 200 MW peak.

Built-to-suit

  • 22 MW built-to-suit hall: dedicated power, cooling and access zones for a single tenant's GPU cluster, live late 2026, on a campus with a 200 MW peak.
  • AI-native fit-out: direct liquid cooling for the latest NVIDIA generation (GB300 today, Vera Rubin from 2028), closed-loop cooling plant that uses no water, 2N utility power.
  • Proven model: the customer rents the hall and installs its own hardware; MCF Group Estonia builds and runs the facility. See the Nebius case study.
  • Security to specification: separate access zones, dedicated CCTV, PCI DSS AOC and EMP shielding on request.
  • Timeline: the 22 MW hall goes live in late 2026; the next built-to-suit hall opens in early 2028 and reservations are open.
Raw, unfitted floor space ready for a built-to-suit hall.
Leased
22 MW built-to-suit hall, live late 2026
Hardware
Latest NVIDIA generation: GB300 today, Vera Rubin 2028
Cooling
Direct liquid cooling, closed loop, no water
Further capacity
Early 2028, built-to-suit; campus peak 200 MW

Connectivity

Carrier- and cloud-neutral. You choose the provider.

Eight fibre backbones enter the building from four directions, local and international carriers are present in the facility. Design your network the way you need it and change partners when you want: price and quality stay under your control.

Cross-connects

an optical cable from your equipment straight to another customer or to your chosen provider inside the data center. Adding or swapping partners is a work order, not a project.

Internet providers

100% provider-neutral, so you can combine transit, peering and cloud on-ramps from several carriers at once.

Wavelengths and dark fibre

most operators on site offer CWDM and DWDM wavelength services to the main hubs in Estonia and beyond; Greenergy also owns fibres it can lease to customers.

Carriers present on site. If yours is not listed, tell us and we will arrange it.

  • Arelion ↗

    Tier 1 backbone (AS1299): IP transit, DDoS protection, DWDM 10G to 400G, MPLS and cloud connect.

  • Telia ↗

    The widest Nordic and Baltic network: DWDM wavelengths, fibre, Ethernet to 10 Gbit/s, dedicated internet.

  • Tele2 ↗

    Ethernet 10 Mbit/s to 400 GE, DIA and IP transit, DDoS protection, wavelength and media services.

  • Elisa ↗

    Data services for business and public sector.

  • RETN ↗

    Independent Eurasian IP transit and enterprise network operator: IP transit, Ethernet, VPN, cloud connect.

  • CITIC Telecom CPC ↗

    Global network with 160+ PoPs, 19 cloud centres and 30+ data centers.

  • Cogent ↗

    IP transit and Ethernet for business and public sector.

  • Pilvio ↗

    Estonian cloud and connectivity provider.

  • ELASA ↗

    Fibre leasing for licensed operators and state institutions.

  • RIA (Estonian state network) ↗

    Data and internet services for state agencies and municipalities.

Support services

Services that give you your time back.

The point of colocation is not having to be always on site. Our 24/7 operations team handles the hands-on work, so your engineers handle the systems.

Access management
you give us the list of who may approach your equipment; 24/7 armed security, 300 cameras, biometric identification and AI-supported mantraps do the rest.
Remote hands
you issue and confirm a work order, our specialists execute it. The operations center never closes, so help is always within reach.
Logistics and storage
we receive shipments and hold them in spacious storage rooms until you, your partner or our team install them.
Staging room
clean, spacious assembly room for unpacking, racking and stacking equipment.
Cleaning and waste
we dispose of packaging from staging, keep shared areas clean.
Meeting and office rooms
six rooms in the A1 building, from a two-desk cabinet to a 65 m² workspace, bookable by the hour or day. Coffee and tea included.

Rooms for rent

Tallinn
48 m², U-shape for 14 or theatre for 28, two large screens, ClickShare, webcam, optional cross-connect
Prague
38 m², oval table for 8 or theatre for 20, portable touch screen, Owl Pro 360° camera
Warsaw
20 m² cabinet for up to 4, screen, webcam, whiteboard
Vilnius
18 m² office for up to 6, oval conference table
Sofia
65 m², meeting table for 9 and six adjustable workstations
Riga
18 m² cabinet with two height-adjustable desks, portable whiteboard

Available Mon to Fri 9:00 to 17:00, other times by agreement. Prices on request; house rules apply. Book at booking@greenergydatacenters.com

Facility datasheet

Operating specification, Hüüru campus.

Figures reflect the campus as operated and as announced in July and August 2026. Request the full technical documentation through the sales team.

Power

Campus peak
200 MW grid connection
Colocation
2 MW of rack capacity
Built-to-suit
22 MW hall for the latest NVIDIA generation, live late 2026
Next capacity
Early 2028, designed for NVIDIA Vera Rubin
Redundancy
UPS and generators in N+1 and 2N configurations

Cooling

Air
Hot-aisle containment for air-cooled racks
Water
Closed loop; no water is used to cool servers

Connectivity

Neutrality
Carrier- and cloud-neutral
Carriers
multiple providers in the facility, including Arelion, Telia, Tele2, Elisa, RETN and others
Fibre
Eight backbones entering from four directions; multi-duct for customer fibre
Latency
Helsinki 1.6 ms, Stockholm 7.8 ms, Frankfurt 25.1 ms round trip

Security

Perimeter
3 m fencing, automatic road blockers, thermal and motion cameras with analytics
Staffing
24/7 armed security, 300+ cameras with AI-driven detection
Access
Multi-level access control with anti-passback, encrypted cards and palm biometrics
Fire
Oxygen-reduction fire prevention
Shielding
EMP shielding available

Operations

Staffing
24/7 in-house NOC
Availability
Level 3 availability since 2022 commissioning
Monitoring
3,000+ infrastructure monitoring sensors

Sustainability

Energy
Certified renewable energy with PPA options
Water
None used for server cooling

Location

Site
Low-risk site away from hazardous traffic and industry

Ownership

Operator
MCF Group Estonia builds and runs the facility
Adviser to 3SIIF
Amber Infrastructure ↗

Customers

Sectors
Banks, payment processors, utilities, technology companies and AI cloud operators