Facility datasheet
The numbers your architects will ask for.
Figures reflect the campus as operated and as announced in July and August 2026. Request the full technical documentation through the sales team.
Power
- Campus peak
- 200 MW grid connection
- Colocation
- 2 MW of rack capacity
- Built-to-suit
- 22 MW hall for the latest NVIDIA generation, live late 2026
- Next capacity
- Early 2028, designed for NVIDIA Vera Rubin
- Redundancy
- UPS and generators in N+1 and 2N configurations
Cooling
- Air
- Hot-aisle containment for air-cooled racks
- Water
- Closed loop; no water is used to cool servers
Connectivity
- Neutrality
- Carrier- and cloud-neutral
- Carriers
- multiple providers in the facility, including Arelion, Telia, Tele2, Elisa, RETN and others
- Fibre
- Eight backbones entering from four directions; multi-duct for customer fibre
- Latency
- Helsinki 1.6 ms, Stockholm 7.8 ms, Frankfurt 25.1 ms round trip
Security
- Perimeter
- 3 m fencing, automatic road blockers, thermal and motion cameras with analytics
- Staffing
- 24/7 armed security, 300+ cameras with AI-driven detection
- Access
- Multi-level access control with anti-passback, encrypted cards and palm biometrics
- Fire
- Oxygen-reduction fire prevention
- Shielding
- EMP shielding available
Operations
- Staffing
- 24/7 in-house NOC
- Availability
- Level 3 availability since 2022 commissioning
- Monitoring
- 3,000+ infrastructure monitoring sensors
Sustainability
- Energy
- Certified renewable energy with PPA options
- Water
- None used for server cooling
Location
- Site
- Low-risk site away from hazardous traffic and industry
Ownership
- Operator
- MCF Group Estonia builds and runs the facility
Customers
- Sectors
- Banks, payment processors, utilities, technology companies and AI cloud operators
EN 50600 certificate 661146.24 issued by TÜV NORD CERT GmbH for Tallinn DC-1, valid 10.10.2024 to 03.11.2026. View the certificate (PDF) ↗